🎧 TOEIC 核心單字 — 第 6 頁:專案管理篇
⬅ 第 5 頁 | 第 6 / 10 頁 | 第 7 頁 ➡
| # | 單字 | 音標 IPA | 中文 | 例句 |
review |
|---|---|---|---|---|---|
|
51
|
Milestone | n./ˈmaɪl.stəʊn/ |
里程碑 (專案進度) |
Completing the EVT phase was a critical milestone for the product timeline. 完成 EVT 階段是產品時程的重要里程碑。 |
|
|
52
|
Deliverable | n./dɪˈlɪv.ər.ə.bəl/ |
應交付成果 |
The final validation report is the main deliverable for this sprint. 最終驗證報告是本次衝刺的主要應交付成果。 |
|
|
53
|
Feasibility | n./ˌfiː.zəˈbɪl.ə.ti/ |
可行性 (評估) |
A feasibility study was conducted before committing to the new PCIe 5.0 design. 在決定採用新的 PCIe 5.0 設計前,進行了可行性研究。 |
|
|
54
|
Assessment | n./əˈses.mənt/ |
評估/評定 |
The risk assessment identified three critical failure modes in the controller. 風險評估在控制器中識別出三種關鍵故障模式。 |
|
|
55
|
Evaluation | n./ɪˌvæl.juˈeɪ.ʃən/ |
評價/估計 |
The evaluation board was shipped to customers for early performance testing. 評估板已寄送給客戶進行早期效能測試。 |
|
|
56
|
Collaboration | n./kəˌlæb.əˈreɪ.ʃən/ |
協作 |
Cross-team collaboration between firmware and hardware engineers reduced bugs by 30%. 韌體與硬體工程師的跨團隊協作使缺陷減少了 30%。 |
|
|
57
|
Coordination | n./kəʊˌɔː.dɪˈneɪ.ʃən/ |
協調 |
Effective coordination between supply chain and manufacturing prevented delays. 供應鏈與製造部門的有效協調防止了延誤。 |
|
|
58
|
Efficiency | n./ɪˈfɪʃ.ən.si/ |
效率 |
Improving power efficiency allowed the SSD to operate at higher sustained speeds. 提升電源效率使 SSD 能以更高的持續速度運行。 |
|
|
59
|
Productivity | n./ˌprɒd.ʌkˈtɪv.ə.ti/ |
生產力 |
Automation tools significantly boosted engineering team productivity. 自動化工具顯著提升了工程團隊的生產力。 |
|
|
60
|
Strategy | n./ˈstræt.ə.dʒi/ |
策略 |
The company's long-term strategy targets the enterprise SSD market. 公司的長期策略是以企業級 SSD 市場為目標。 |
⬅ 第 5 頁 | 第 6 / 10 頁 | 第 7 頁 ➡
🧠 記憶圖 / 筆記

📝 例句練習
- Completing the EVT phase was a critical milestone for the product timeline.
完成 EVT 階段是產品時程的重要里程碑。
- The final validation report is the main deliverable for this sprint.
最終驗證報告是本次衝刺的主要應交付成果。
- A feasibility study was conducted before committing to the new PCIe 5.0 design.
在決定採用新的 PCIe 5.0 設計前,進行了可行性研究。
- The risk assessment identified three critical failure modes in the controller.
風險評估在控制器中識別出三種關鍵故障模式。
- The evaluation board was shipped to customers for early performance testing.
評估板已寄送給客戶進行早期效能測試。
- Cross-team collaboration between firmware and hardware engineers reduced bugs by 30%.
韌體與硬體工程師的跨團隊協作使缺陷減少了 30%。
- Effective coordination between supply chain and manufacturing prevented delays.
供應鏈與製造部門的有效協調防止了延誤。
- Improving power efficiency allowed the SSD to operate at higher sustained speeds.
提升電源效率使 SSD 能以更高的持續速度運行。
- Automation tools significantly boosted engineering team productivity.
自動化工具顯著提升了工程團隊的生產力。
- The company’s long-term strategy targets the enterprise SSD market.
公司的長期策略是以企業級 SSD 市場為目標。