🎧 TOEIC 核心單字 — 第 6 頁:專案管理篇

⬅ 第 5 頁  |  第 6 / 10 頁  |  第 7 頁 ➡

# 單字 音標 IPA 中文 例句 review
51
Milestone n./ˈmaɪl.stəʊn/ 里程碑 (專案進度) Completing the EVT phase was a critical milestone for the product timeline.
完成 EVT 階段是產品時程的重要里程碑。
52
Deliverable n./dɪˈlɪv.ər.ə.bəl/ 應交付成果 The final validation report is the main deliverable for this sprint.
最終驗證報告是本次衝刺的主要應交付成果。
53
Feasibility n./ˌfiː.zəˈbɪl.ə.ti/ 可行性 (評估) A feasibility study was conducted before committing to the new PCIe 5.0 design.
在決定採用新的 PCIe 5.0 設計前,進行了可行性研究。
54
Assessment n./əˈses.mənt/ 評估/評定 The risk assessment identified three critical failure modes in the controller.
風險評估在控制器中識別出三種關鍵故障模式。
55
Evaluation n./ɪˌvæl.juˈeɪ.ʃən/ 評價/估計 The evaluation board was shipped to customers for early performance testing.
評估板已寄送給客戶進行早期效能測試。
56
Collaboration n./kəˌlæb.əˈreɪ.ʃən/ 協作 Cross-team collaboration between firmware and hardware engineers reduced bugs by 30%.
韌體與硬體工程師的跨團隊協作使缺陷減少了 30%。
57
Coordination n./kəʊˌɔː.dɪˈneɪ.ʃən/ 協調 Effective coordination between supply chain and manufacturing prevented delays.
供應鏈與製造部門的有效協調防止了延誤。
58
Efficiency n./ɪˈfɪʃ.ən.si/ 效率 Improving power efficiency allowed the SSD to operate at higher sustained speeds.
提升電源效率使 SSD 能以更高的持續速度運行。
59
Productivity n./ˌprɒd.ʌkˈtɪv.ə.ti/ 生產力 Automation tools significantly boosted engineering team productivity.
自動化工具顯著提升了工程團隊的生產力。
60
Strategy n./ˈstræt.ə.dʒi/ 策略 The company's long-term strategy targets the enterprise SSD market.
公司的長期策略是以企業級 SSD 市場為目標。

⬅ 第 5 頁  |  第 6 / 10 頁  |  第 7 頁 ➡

🧠 記憶圖 / 筆記

專案管理篇 記憶示意圖


📝 例句練習

  1. Completing the EVT phase was a critical milestone for the product timeline.

    完成 EVT 階段是產品時程的重要里程碑。

  2. The final validation report is the main deliverable for this sprint.

    最終驗證報告是本次衝刺的主要應交付成果。

  3. A feasibility study was conducted before committing to the new PCIe 5.0 design.

    在決定採用新的 PCIe 5.0 設計前,進行了可行性研究。

  4. The risk assessment identified three critical failure modes in the controller.

    風險評估在控制器中識別出三種關鍵故障模式。

  5. The evaluation board was shipped to customers for early performance testing.

    評估板已寄送給客戶進行早期效能測試。

  6. Cross-team collaboration between firmware and hardware engineers reduced bugs by 30%.

    韌體與硬體工程師的跨團隊協作使缺陷減少了 30%。

  7. Effective coordination between supply chain and manufacturing prevented delays.

    供應鏈與製造部門的有效協調防止了延誤。

  8. Improving power efficiency allowed the SSD to operate at higher sustained speeds.

    提升電源效率使 SSD 能以更高的持續速度運行。

  9. Automation tools significantly boosted engineering team productivity.

    自動化工具顯著提升了工程團隊的生產力。

  10. The company’s long-term strategy targets the enterprise SSD market.

    公司的長期策略是以企業級 SSD 市場為目標。